[Beowulf] Why need of a scheduler??
Many of your questions may have already been answered in earlier discussions or in the FAQ. The search results page will indicate current discussions as well as past list serves, articles, and papers.
Chris Vaughan supercomputer at gmail.comWed Jan 9 08:07:20 PST 2008
- Previous message: [Beowulf] Multiple NIC on a node
- Next message: [Beowulf] Why need of a scheduler??
- Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]
On Nov 29, 2007 1:14 PM, amjad ali <amjad11 at gmail.com> wrote: > Hello all, > > I want to develop and run my parallel code (MPI based) on a Beowulf > cluster. I have no problem as such that many user might log on to the > cluster simultaneously. Suppose that I am free to use cluster dedicatedly > for my single parallel application. > > 1) Do I really need a cluster scheduler installed on the cluster? Should I > use scheduler? > Yes, it makes things easier to control and keep track of. > > 2) Is there any effect/benefit on the running of a parallel code with or > without cluster job scheduler? > It depends how many jobs/nodes you run on a 4 node system you would be fine running something like torque with pbs_sched. If your requirements become higher I'd recommend Maui and for those complex environments with many cores/nodes I'd recommend Moab. The benefit is ease of use, the more jobs you run the harder it is to manage those jobs. > > 3) How you differentiate between cluster scheduler and cluster resource > manager? > One schedules the other gives back information about what resources are available. > > 4) If there is any significant difference between a scheduler and manager > then plaese tell me that which of the fall in which category: > > OpenPBS, PBS Professional, SGE, Maui, Moab, Torque, Scyld, LSF, SLURM etc. > Torque=Resource Manager (RM) w/basic scheduling PBS=(RM) w/some scheduling functionality SGE=(RM) w/some scheduling functionality Maui=Scheduler Moab=Scheduler + More OpenPBS=Use Torque LSF=(RM) w/some scheduling functionality SLURM=(RM) w/basic scheduling A resource manager manages resources where as a scheduler can schedule these resources. Although something like torque resource manager (OpenPBS) has pbs _sched a fifo scheduler it is still in-adequate in most environments and you would need a scheduler such as Maui or Moab to schedule it. > > 5) What is maent by " PBS/SGE/LSF supports integration with the Maui > scheduler? > You have this mixed up with Moab, Moab can talk to all of these resource managers and give you a single point of job submission/administration over all resource managers. Cluster Resources provide free support to eval Moab which can be quite handy http://www.clusterresources.com/pages/products/evaluate.php > > Precise, easy and brief reply requested. Thanks to all. > > > > _______________________________________________ > Beowulf mailing list, Beowulf at beowulf.org > To change your subscription (digest mode or unsubscribe) visit > http://www.beowulf.org/mailman/listinfo/beowulf > > -- ------------------------------ Christopher Vaughan -------------- next part -------------- An HTML attachment was scrubbed... URL: http://www.scyld.com/pipermail/beowulf/attachments/20080109/8892874d/attachment.html
- Previous message: [Beowulf] Multiple NIC on a node
- Next message: [Beowulf] Why need of a scheduler??
- Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]
More information about the Beowulf mailing list
