[Beowulf] Q: Cooling units? Raised floors? General machine room stuff..
Many of your questions may have already been answered in earlier discussions or in the FAQ. The search results page will indicate current discussions as well as past list serves, articles, and papers.
Brian Dobbins brian.dobbins at yale.eduThu Jul 1 13:54:03 PDT 2004
- Previous message: [Beowulf] Network benchmark - MPI
- Next message: [Beowulf] Q: Cooling units? Raised floors? General machine room stuff..
- Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]
Hi guys, I've recently put together a plan for a machine room in one of our lab spaces, but I'm not very knowledgeable about cooling (or infrastructure in general!), and would love to hear some thoughts on what the experts here think. At the moment, a high-end power estimate is approx. 14.5kW for the systems we'll be running in the near future, and using Dr. Rob Brown's figures from his (excellent) writeup on Beowulf Infrastructure (http://www.linux-mag.com/2003-06/infrastructure_01.html), I'm estimating about 4.2 tons of AC needed. So here's the first of many questions - given the fact that we expect to expand our resources in the future, do we go with a much larger AC now? Or is it possible/useful to simply add a second one later? And are there any particular AC vendors people tend to recommend? Secondly, given this is a rather small machine room (aiming for a max capacity of 5 42U racks), what advantage would be found in going with a raised floor? And does anyone have any cost estimates on raised floors for rooms on the order of, say, 15' by 15'? Finally, what other suggestions do people have for equipment needed? On my list we've got the UPS, the AC, thermal sensors and killswitches, APC Masterswitch units, power lines, network lines, web/video camera and an alarm. Anything else people find useful? Thanks very much, - Brian Brian Dobbins Yale Mechanical Engineering
- Previous message: [Beowulf] Network benchmark - MPI
- Next message: [Beowulf] Q: Cooling units? Raised floors? General machine room stuff..
- Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]
More information about the Beowulf mailing list
