[Beowulf] 512 nodes Myrinet cluster Challanges
Many of your questions may have already been answered in earlier discussions or in the FAQ. The search results page will indicate current discussions as well as past list serves, articles, and papers.
Bill Broadley bill at cse.ucdavis.eduTue May 2 14:02:10 PDT 2006
- Previous message: [Beowulf] 512 nodes Myrinet cluster Challanges
- Next message: [Beowulf] 512 nodes Myrinet cluster Challanges
- Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]
Mark Hahn said: > moving it, stripped them out as I didn't need them. (I _do_ always require > net-IPMI on anything newly purchased.) I've added more nodes to the cluster Net-IPMI on all hardware? Why? Running a second (or 3rd) network isn't a trivial amount of additional complexity, cables, or cost. What do you figure you pay extra on the nodes (many vendors charge to add IPMI, sun, tyan, supermicro, etc), cables, switches, etc. As a data point on a x2100 I bought recently the IPMI card was $150. Seems like collecting fan speeds and temperatures in-band seems reasonable, after all much of the data you want to collect isn't available via IPMI anyways (cpu utilization, memory, disk I/O, etc.). Upgrading a 208 3phase PDU to a switched PDU seems like it costs on the order of $30 per node list. As a side benefit you get easy to query load per phase. The management network ends up being just one network cable per PDU (usually 2-3 per rack). After dealing with a few clusters with PDUs in the airflow blocking airflow and physical access to parts of the node I now specify the zero-u variety that are outside the airflow. -- Bill Broadley Computational Science and Engineering UC Davis
- Previous message: [Beowulf] 512 nodes Myrinet cluster Challanges
- Next message: [Beowulf] 512 nodes Myrinet cluster Challanges
- Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]
More information about the Beowulf mailing list
