Need ball park power and cooling requirements
Many of your questions may have already been answered in earlier discussions or in the FAQ. The search results page will indicate current discussions as well as past list serves, articles, and papers.
Ray Muno muno at aem.umn.eduWed Oct 2 06:30:05 PDT 2002
- Previous message: Need ball park power and cooling requirements
- Next message: Need ball park power and cooling requirements
- Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]
On Tue, Oct 01, 2002 at 03:12:52PM -0400, Robert G. Brown wrote: > On Tue, 1 Oct 2002, Dan Sturtevant wrote: > > > > > > I'm setting up lab space and plan to build a small (8-16 node) cluster > > > of dual Xeon nodes (Dell 2650 or equivalent). I need to give the > > > engineers the power and cooling needed in the 6'x8' server room that > > > will house the cluster. Any rules-of-thumb for what's required? Thanks. > > > > I would put each set of 8 nodes on a separate 20 amp circuit. > > Also, I'd strongly suggest that you ensure that you are using power > factor correcting power supplies in the nodes themselves AND make sure > that your electrical contractors are competent. For example, if they > run multiple circuits with different phases, do not permit them to share > a common neutral. There are companies that make harmonic mediating > transformers that can compensate for the harmonic distortion caused by > switching power supplies, if it turns out to be impossible to get PFC > supplies from Dell or whoever. > > Because switching power supplies draw basically all of their current in > the middle third of each voltage half-cycle: a) cancellation that might > have occurred in shared neutrals becomes addition instead, leading to > dangerous overheating of the neutral line; b) just using RMS power > consumption and the assumption of voltage and currents in phase > significantly underestimates the peak currents drawn by the systems -- > you may find your 20A breakers blowing when you are only drawing > 1100-1200 watts instead of the 1500-1600 you might have expected to run > on a 2400 VA line; c) PFC supplies consume less energy on average, and > the power companies often charge you less money for what you use if you > don't need the high peak currents associated with a relatively poor > power factor. > These are very good points. We just installed a couple of 36 kVA UPS's in our cluster room and main server room. We had to call the electricians back because the UPS manufacturer requires a neutral of double the ampacity of the 3-phase primaries, either a pair of the same size as the primaries or a single feeder that meets the rating. The neutral current, for typical data center loads, is rated at 175% of the primary phases. In contrast, we are housed in an old building (1948 era). All of the electrical distribution panels (3 phase) have neutrals that are smaller then the primaries. The main loads in the building when it was designed, were lights. This causes us a great deal of problem now that the main loads are air conditioners, computers, printers and copiers. The harmonics present cause all kinds of problems with our lab instrumentation in the building. To address this issue, we ended up bringing in a new 700 kVA 480V service in to the building which meets "modern" requirements. We were lucky to be able to tie our power for our cluster room to that instead of the existing electrical service. We are also in the process of gutting and re-feeding the existing panels mainly to increase the neutral capacity. As many people have pointed out in the past, the facilities costs, many time overlooked in the planning stage, are a significant share of the cost of housing a large installation of computers. ============================================================================= Ray Muno http://www.aem.umn.edu/people/staff/muno University of Minnesota e-mail: muno at aem.umn.edu Aerospace Engineering and Mechanics Phone: (612) 625-9531 110 Union St. S.E. FAX: (612) 626-1558 Minneapolis, Mn 55455 =============================================================================
- Previous message: Need ball park power and cooling requirements
- Next message: Need ball park power and cooling requirements
- Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]
More information about the Beowulf mailing list